EV Charger Installation in Surrey, Sussex, Kent & London

EV charger installation for homes and businesses from an OZEV-authorised chargepoint installer. For a home charger, we handle the site survey, choosing the charger, the application to your Distribution Network Operator and the installation.

JD · Home EV installationProcess
Step 01
Survey
Step 02
Charger choice
Step 03
DNO & install
Step 04
Certificate
OZEVListed on the GOV.UK register of OZEV-authorised chargepoint installers. Check the register

Accreditations, installer approvals and the chargers we fit

Registered & qualified

  • NICEICDomestic Installer
  • City & Guilds

Approved installer for

  • Tesla Wall Connector
  • myenergi
  • Simpson & Partners

Other chargers we fit

  • Andersen
  • Ohme
  • Pod Point
  • Rolec EV

02 The installation

What's involved in a home EV charger installation

  • 01

    Photos, videos and a site survey

    We'll ask you for photos and videos, then visit your property to do a site survey.

  • 02

    Choosing the charger

    The right charger depends on your car, where you park, tethered or untethered, solar and your tariff. The comparison below shows what each manufacturer says about its charger.

  • 03

    Your Distribution Network Operator

    What your Distribution Network Operator (DNO) needs depends on the charger and your supply. We'll submit an application to your DNO, and once permission has been agreed, we'll arrange an installation date.

  • 04

    Electrical Installation Certificate

    After the installation, we'll provide an Electrical Installation Certificate.

  • 05

    Handover and warranties

    We connect the charger to your Wi-Fi, set up the app and show you how to schedule charging. Two warranties apply, and they're separate. The charger's product warranty comes from its manufacturer, on the manufacturer's terms (see the table below). Our own workmanship warranty covers the installation for 3 years.

This is the process for a home charger. Installing at a workplace or car park? See commercial EV charging.

OZEV-authorised chargepoint installer

JD is listed on the GOV.UK register of OZEV-authorised chargepoint installers. That means we can fit grant-funded chargers and make the grant claim. It doesn't decide whether a grant is approved: OZEV does.

GOV.UK installer register

03 Chargers

Choosing a charger

Most home chargers are 7kW smart units. The differences come down to looks, tethered or untethered, solar and how the app works with your tariff. We'll tell you which we'd pick for your car and driveway.

Manufacturer specifications · checked 6 Nov 2026
ChargerPowerCableSolar (as the manufacturer states it)Manufacturer product warrantySource
Andersen A27kW or 22kWHidden tethered cable: 5.5m or 8.5m (7kW), 6.5m (22kW)Solar compatible on 7kW models only. Andersen doesn't list extra equipment on its solar page.7 years. It must be activated within 7 days of installation (or 30 days of purchase). Cover is on-site or return-to-base, depending on who installs it.A2 specs
Solar
Warranty terms
Andersen A37kWHidden tethered cable, 5.5mSolar compatible. Andersen doesn't list extra equipment on its solar page.7 years, on the same activation terms as the A2.A3 specs
Solar
Warranty terms
myenergi zappi7kW (up to 7.4kW) single-phase, or 22kW three-phaseTethered Type 2 (6.5m) or untetheredEco and Eco+ modes charge from your own solar or wind generation. A CT clamp comes in the box.3 years as standard.zappi specs & warranty
Ohme Home Pro7.4kW (32A)Tethered Type 2, 5m (8m optional)Solar Boost and Solar Only modes. These need a CT clamp near the meter, a charger installed from January 2023, and app version 2.10.2 or later.3 years as standard.Home Pro specs
Solar requirements
Pod Point Solo 3SUp to 7.4kWUntethered (Type 2 socket) or tethered (6.5m)——Solo 3S specs
Simpson & Partners Home Series (wall mount)7kW or 22kW——3 years on-site cover for the electronics. Register within 6 weeks of despatch to add 2 years back-to-base (electronics) and 10 years on the enclosure.Range
Warranty
Tesla Wall ConnectorUp to 22kW (32A); 7.4kW on a single-phase supply——48 months from invoice for normal residential use; 12 months for commercial use.Wall Connector support

Specs and product warranties come from each manufacturer's own documentation, linked in each row and checked on 6 November 2026. Product warranties are provided by the manufacturer, on its terms, not by JD. A dash means that manufacturer page doesn't state it, so we haven't claimed it. Your car and supply decide the power you actually get.

04 Paying for it

Grants and funding

Government grants

If you rent, or own a flat, and have private off-street parking and an eligible EV, you may be able to get up to £500 (75% of the cost, capped). Eligible businesses, charities and public bodies may get up to £500 per socket through the Workplace Charging Scheme, and residential landlords up to £500 per socket. There are also grants for homes with only on-street parking and for state-funded education.

OZEV decides who qualifies and must confirm eligibility before the charger is installed. Using an OZEV-authorised chargepoint installer doesn't guarantee approval. There's no grant for owner-occupied houses with off-street parking.

The schemes are funded until 31 March 2027, and the government can change or end them sooner. Checked against GOV.UK on 6 November 2026.

Funded commercial charging

For larger commercial sites there's another option. Our funding partner Wattif EV can install and run chargers with no upfront cost and share the revenue with you.

05 Home EV installs

From first call to first charge at home

  1. 01

    Get in touch

    Tell us about your car, your parking and your plans. The quote is free.

  2. 02

    Photos and survey

    We'll ask for photos and videos, then visit your property to do a site survey.

  3. 03

    DNO application

    We'll submit an application to your Distribution Network Operator. Any grant application must be approved before installation.

  4. 04

    Installation

    Once permission has been agreed, we'll arrange an installation date. Finished in a day for most homes.

  5. 05

    Certificate

    We'll provide an Electrical Installation Certificate for the installation.

06 Service area

Where we install

We install EV chargers for homes and businesses across Surrey, Sussex, Kent and London.

We'll confirm we cover it when we reply.

07 Recent work

Recent EV charger installations

A few of our own EV jobs, for homes and businesses.

Open larger photo: myenergi Zappi EV charger fitted by JD Electrical on a block-paved driveway, with an electric car parked behind it
myenergi zappi · Oxted
Open larger photo: Andersen EV charger with a timber front panel, fitted on a red-brick wall beside a front door
Andersen charger · Oxted
Open larger photo: New consumer unit with a dedicated, labelled EV charger circuit
Dedicated EV circuit · Godstone
Open larger photo: EV charger mounted on a concrete pillar in an underground car park
Workplace chargers · Cobham

08 Questions

Questions people ask us

How much does EV charger installation cost?

Prices begin at £625 for a basic home installation. The final price depends on the charger, the length of the cable run, any groundworks and whether your consumer unit needs work. We'll give you a free, no-obligation quote after the site survey.

Can any electrician install an EV charger?

A qualified electrician can fit one, and the work has to meet the UK wiring regulations (BS 7671). If you want to use a government grant, the charger must be fitted by an OZEV-authorised chargepoint installer. JD is listed on the GOV.UK register as one.

How long does installation take?

Most home installs take one day. Commercial jobs depend on the number of sockets and any groundworks.

Do I need permission to install a charger?

It depends on your home. If you rent or live in a flat, check with your landlord, freeholder or managing agent first. The renters and flat owners grant needs their written permission, plus your local authority's if the building is listed. If you only have on-street parking, a cross-pavement solution needs your local highways authority's consent, and planning permission in some cases.

Can I get a grant?

Possibly. If you rent, or own a flat, and have private off-street parking, you may be able to get up to £500. There are also grants for workplaces, residential landlords, homes with only on-street parking and state-funded education. There's no grant for owner-occupied houses with off-street parking. OZEV decides who qualifies and must confirm eligibility before the charger is fitted. The schemes are funded until 31 March 2027, and the government can change or end them sooner.

09 Free quote

Get a quote

Send us a photo of your fuse board and where you park, and we'll come back with a price.

  • Free, no-obligation quote
  • Not sure if it's a home or business job? Choose "Not sure yet" and we'll work it out with you
Is this for a home or a business?

We only use your details to reply to your enquiry and carry out any work you book. See our privacy policy.